2.本期增加金额108,363,535.32 35,090,819.0569,047,195.4413,862,096.10 226,363,645.91
(1)购置13,750,404.18 6,340,665.9358,374,829.319,249,624.1087,715,523.52
(2)在建工程转入 36,079,277.353,976,497.68273,727.8440,329,502.87
(3)企业合并增加 58,533,853.79 24,773,655.4410,672,366.134,338,744.1698,318,619.52
3.本期减少金额20,884.73436,790.00149,189.62606,864.35
(1)处置或报废20,884.73436,790.00149,189.62606,864.35
4.期末余额460,473,437.45 99,983,839.6183,393,649.96 112,190,643.76756,041,570.78
1.期初余额35,148,191.14 11,906,370.937,829,540.13 22,369,709.2677,253,811.46
2.本期增加金额17,618,746.01 14,802,050.6510,308,363.207,319,679.5450,048,839.40
(1)计提13,061,471.50 6,848,917.684,954,012.325,847,152.6230,711,554.12
(2)合并增加4,557,274.51 7,953,132.975,354,350.881,472,526.9219,337,285.28
3.本期减少金额5,602.40423,002.9883,569.07512,174.45
(1)处置或报废5,602.40423,002.9883,569.07512,174.45
4.期末余额52,766,937.15 26,702,819.1817,714,900.3529,605,819.73 126,790,476.41
1.期末账面价值407,706,500.30 73,281,020.4365,678,749.6182,584,824.03 629,251,094.37
2.期初账面价值316,961,710.99 53,007,534.366,953,704.39 76,108,028.02 453,030,977.76
(2)暂时闲置的固定资产情况
单位: 元
项目账面原值累计折旧减值准备账面价值备注
(3)通过融资租赁租入的固定资产情况
单位: 元
项目账面原值累计折旧减值准备账面价值
(4)通过经营租赁租出的固定资产
单位: 元
项目期末账面价值
桑德环境资源股份 2014 年年度报告全文
(5)未办妥产权证书的固定资产情况
单位: 元
项目账面价值未办妥产权证书的原因
其他说明
16、在建工程
(1)在建工程情况
单位: 元
期末余额期初余额
项目
账面余额减值准备 账面价值账面余额减值准备账面价值
1、湖南静脉园项
752,867,633.13752,867,633.13 546,507,419.45546,507,419.45
目
2、包头南郊污水
182,530,061.22182,530,061.22 21,151,053.5021,151,053.50
处理厂扩建项目